Hengqin Dachanghang first phase cold storage project
Area: 9000m²
Introduction: The temperature zone has a wide span, including -25℃ warehouse, -18℃ warehouse, -18℃ to -25℃ warehouse, -18℃ to +4℃ warehouse, -40℃ warehouse, and 0℃ to 10℃ low temperature platform. Including direct expansion system, barrel pump system, floor heating system, automated lighting system, and intelligent cloud system.
Time: 2019
Area: 9000m²
Introduction: The temperature zone has a wide span, including -25℃ warehouse, -18℃ warehouse, -18℃ to -25℃ warehouse, -18℃ to +4℃ warehouse, -40℃ warehouse, and 0℃ to 10℃ low temperature platform. Including direct expansion system, barrel pump system, floor heating system, automated lighting system, and intelligent cloud system.
General Mills (three factories in Hebei, Shanghai and Guangzhou)
Hebei Plant: Phase I plant air conditioning system, heating system, air supply and exhaust system, dust removal system and related electrical control system. The total area is 6800m².
Shanghai Factory: Ventilation and air-conditioning transformation of WCF workshop and corresponding electrical control system. The total area is 5100m².
Guangzhou Factory: Workshop renovation project in pastry forming area, Haagen-Dazs cold storage renovation project, production workshop refrigeration and air conditioning renovation project, etc. The total area is 7000m².
More Projects
Online Consultation
Follow the official WeChat account
Or search for "Huayi Electromechanical"
More exciting waiting for you!
Contact Number:130-6638-2361 Mr. Wang
Contact Address:401, Block A, Jiayuan, No. 728, Kaihua Avenue, Huangpu District, Guangzhou
Copyright © Guangzhou Huayi Mechanical and Electrical Installation Co., Ltd. 2021 All rights reserved